Rostering

The award problem shows up while the shift is still a draft.

Most rostering tools tell you about an award problem when payroll runs, which is about three weeks after you could have done something about it. This one tells you while you are still dragging the shift around, and tells you what it will cost.

A week you build by clicking

Workers down the side, days across the top, shifts where the two meet. Set a pattern once and it generates forward. Shift types bring their own defaults with them. And when the support changes halfway through a shift, you split it into sections rather than inventing two shifts that pretend to be one.

Clashes surface as you place, not when you save

Double-bookings, unavailability and worker pairings that should not happen show up while you are still moving things around. Whether someone is free is answered once, from all three places that can say no — the preference they set, the leave they booked, and the shift they are already on. Three sources, one answer.

An open-shift pool your team can claim from

Publish a gap and let the workers qualified for it take it from their phone. The claim is conflict-checked on the way in, so a shift somebody picked up at 9pm is exactly as safe as one you assigned yourself.

Five award breaches, priced in dollars

Minimum engagement, the daily ordinary-hours cap, the ten-hour rest break, the weekly cap and the broken-shift allowance are all evaluated as the week takes shape. Each warning tells you what it will cost the organisation — the hours at the right penalty, plus casual loading, grossed up by on-costs. That makes it a decision you are making, rather than a red badge you are dismissing.

The part that is hard to copy

Your rates are yours to set, and the maths knows it

Casual loading and the on-cost gross-up are per-organisation, effective-dated data rather than numbers baked into the product — so if you are on an EBA that pays differently, the alerts, the pay run and the margin all cost your shifts at your rates instead of at the SCHADS defaults. Two honest limits: the overtime multipliers stay fixed at the award's 1.5× and 2×, because those are not ours to vary, and an agreement that changes them is not expressible today. Competitors we have looked at hand-type a flat rate table and treat a timesheet as scheduled-minus-break, which cannot describe a broken shift at all, let alone price one.

The rest of it.

Not modules you buy separately. They read the same records, which is why nothing between them ever needs reconciling.

See it on records that look like yours.

Try it free — up to 5 people